you stupid fuck
jesus
FIRST POST, 3 paragraphs down:
"The reactor is just a big sphere surrounded by electro-magnets. The main cost of the plant is converting the 2 million volts DC output to AC for local use. The direct 2 million volt output would be great for long distance transmission. Although the plants could be sited in just about any reasonably sized electrical yard since any required cooling would not requre a water supply. Air cooling would work fine.
The power generator is about 10 to 12 ft across for an output between 100 MW and 1,000 MW. Power output scales as the 7th power of size. Double the size and you get 128X as much power.
No thermal plant is required. Thermal plants - steam generators, turbines etc. - are long lead time items. They can take from 3 to 5 years from start of production to delivery. The Bussard Fusion Reactor output is direct 2 million volts DC. (a very large battery)."
Highlighted in the first post as well:
Why a full-scale demo? Because the system scales oddly: Fusion output goes as the 7th power of the size and Gain goes as the 5th power. Thus there is very little to be gained by building a half-size model; it is too weak to give anything definitive about power production or gain. And our tests were always at about 1/8 to 1/10 scale of the full scale demo. We told the DoD from the beginning that the real program would cost about 150-200 M, since 1987, and they all knew this. However, since the DoD has no charter to do such work, and the political realities were that a big DoD program would attract the ire and power of the DoE to kill it, it was never funded beyond about 1/8 the level required.
Dr. Bussard on his original idea of the Tokamak reactors (again in the first post):
Magnetic confinement fusion is a misnomer, as magnetic fields can NOT confine a plasma, only constrain its motion towards walls. The entire history of the MagConf program has been to reduce transport to neo-classical (not turbulent or instability-driven) losses. And THEN the machines are all inherently and inevitably huge and cost too much and make too much power to ever be economically useful --- as the utilities have been telling the AEC/DoE for 30 years. No matter, the global tokamak program provides jobs for hudreds of thousands of people in many countries, and is a safe place to put political pork funding, simply because it IS NO THREAT TO OIL - it won't ever work, but it sounds good to the untutored public..
Did you LOOK at my first post?
-----
Reading some post made by one of the researchers for Bussard's reactor, he is stating he can create a wb-100 for 35 million dollars.
Wether that is true or not, i have no idea. The 200 million dollar figure is for "a complete research project leading to proof of concept, multiple devices in a step by step approach. " Allegedly.