I did the breakup after work one night, then I spent a day digging out the dirt, adding a trailer hitch to my car, getting the trailer, then loading the dirt and dumping it.
Another day I built a raised garden bed, picked up the concrete bags, setup the form boards.
The final day the guy showed up at 10am and we finished at 5pm with lots of beer breaks.
Probably like a real 4-5hrs for mixing and pouring.
If the job was like twice the size, I might get a powered mixing barrel.
If it was bigger than that, probably call in a truck to pour it. But it would have to be a flat pad.